Posted on December 22, 2021December 22, 2021 by admin AIRPORT CONSTRUCTION MANAGEMENT Working with Lambert-St. Louis International Airport, Lion CSG helped with construction management of a taxiway. Our team worked third shift on the inspection team to make sure tolerances were met for a safe runway. Post navigationPrevious post: THE RAPID TRANSIT CONNECTOR STUDY