Posted on

Coldwater Treatment Facility, St. Louis, Missouri

Over the last decade, Lion CSG has worked on a number of projects at this facility including the Headworks Improvements, Final Clarifier Replacement, and Infrastructure Repairs.  The existing headworks system at the Coldwater plant was not adequately handling influent flow.  Lion CSG provided upgrades to the 55MGD system to manage the intake loading.  Lion CSG was responsible for the design of the clarifier, valves, and associated piping within this project.   In an infrastructure project to provide improvement to the process at Coldwater, Lion CSG was responsible for the demolition design.