Posted on

Lemay Treatment Facility, St. Louis, Missouri

 Lion CSG has worked on a number of projects at the Lemay WWTP including the Secondary Enhanced Clarification, Grit Improvement, and Fluidized Bed Incinerators.  As part of the Lemay Secondary project, Lion CSG was responsible for evaluation and design for increasing treatment capabilities.  Lion CSG also provided recommendations to increase flow through the clarifiers to 210 MGD.  In a project to provide improvement to the process at Lemay, Lion CSG was responsible for assistance with the process design for the grit tanks.  In one of the largest projects completed by the District, Lion CSG assisted with the structural design for the critical project for the fluidized bed incinerators.